Air Liquide integrated a new CO2 carbon capture facility with an existing thermal power station in South Australia. Complex brownfield modifications were required to supply the new CO2 plant with power, steam, exhaust gases and cooling water. Redrawn director Huw Dent was responsible for delivering the detailed design for a 300m long steam piping network connecting 4 boilers to the new CO2 plant. The piping operated at 500oC and 18MPag. This was a high-risk installation with complex analytical requirements, requiring consideration of material selection, corrosion mechanisms, flexibility and restrain analysis, thermal expansion analysis and process risks.